Loading…
En Ligne - On line
14 mai 2016 - Village près de Peam Chileang, pendant la construction de la route en béton longeant le Mekong entre Kampong Cham et Kratie.
14 May 2016 - Village close to Peam Chileang, during the construction of the concrete road along the Mekong between Kampong Cham and Kratie.
Photo size: 2.9 Mpixels (8.41 MB uncompressed) - 2100x1400 pixels (7x4.7 in / 17.8x11.9 cm at 300 ppi)
Published in: Cambodia - Peuple Cham / Cham people